The United States Environmental Protection Agency (EPA) has issued a final reminder to all pesticide-producing and device-producing establishments that their 2024 Annual Production Reports (EPA Form 3540-16) are due by Saturday, March 1, 2025. This deadline applies to all establishments, regardless of whether they produced pesticides or devices during the 2024 calendar year. Failure to report could result in compliance issues and potential penalties.
Key Details for Reporting:
• Electronic Submissions: Reports must be submitted through the Secure Substance Tracking System (SSTS) by 11:59 p.m. Eastern Standard Time on March 1, 2025.
• Mail Submissions: Paper reports must be postmarked no later than March 1, 2025.
The EPA strongly encourages establishments to utilize thee-reporting option via SSTS, which
offers a streamlined process and immediate confirmation of submission status. Establishments can verify their report’s status by logging into SSTS and checking the “Submission History” for Form 3540-16. If the status reads “Accepted by EPA” or “Awaiting EPA Review,” no further action is required unless the EPA contacts you directly for additional information.
Why Reporting Matters:
Annual production reporting is a critical component of the EPA’s oversight of pesticide and device manufacturing. It ensures that the agency has up-to-date information on the production,
distribution, and use of these products, which is essential for protecting public health and the environment. Even if an establishment did not produce any pesticides or devices in 2024, reporting is still required to maintain an active registration.
URL:
BTF Testing Lab, our company has electromagnetic compatibility laboratories, safety regulations Laboratory, wireless radio frequency Laboratory, battery Laboratory, chemical Laboratory, SAR Laboratory, HAC Laboratory, etc. We have obtained qualifications and authorizations such as CMA, CNAS, CPSC, A2LA, VCCI, etc. Our company has an experienced and professional technical engineering team, which can help enterprises solve the problem. If you have relevant testing and certification needs, you can directly contact our Testing staff to obtain detailed cost quotations and cycle information!
Post time: Feb-28-2025